Millworker Help Printable version
Help / Materials

BOM

Assembly Drawing

Bill of materials: sheet goods to buy, panels, layups, hardware, finish areas and edgebanding lengths.

Where
Screenshot placeholder images/bom-preview.png 1600 × 1000 px BOM report preview: the four groups visible (Sheet goods, Panels, Hardware, Edgebanding), page sidebar on the left.
The bill of materials.
The bill of materials.
Sheet goodsThe sheets to buy of each stock, from the same planning as the nest, with the total sheets and area under them.
PanelsBy material and thickness, each with its part number, description and size.
LayupsOnly when the parts have layups: each layup, its panels and their face area.
HardwareLibrary, Content Center and bought parts, counted (including the hardware Place Hardware put in). Handles, pulls and knobs (by part number, description or file name) are always hardware, each, never sheets.
EdgebandingEach band's running length, rounded up in feet with 10% for trimming.

The page is landscape, in six columns: Item, Part, Description (the widest), Qty, Unit and Size. Save it as PDF or CSV, print it, or change the design in Design….

Create Drawing, next to BOM, is not set up yet.